Shirvington Group Pty Ltd

Rev 0 · Sydney, NSW · Australia-wide

The plant, managed, engineered, and set in motion.

  • Project management
  • Mechanical project engineering
  • Technical documentation
  • Interactive training and shutdown animations

I'm Tim, director of Shirvington Group. I deliver project management, mechanical project engineering, technical documentation, and interactive training and shutdown animations for heavy industrial and mining operations across Australia.

More than ten years as a mechanical project engineer and project manager on major projects, covering commissioning and QA/QC on industrial plant, including work for BHP and Newmont. I hold an Advanced Diploma of Mechanical Engineering.

Live telemetry

Plant console

Pressure

420 kPa

Flow

48 m³/h

Isolation

Energised

Step

Centrifugal pump skid with suction and discharge valves, pressure gauge, coupling guard, motor and isolatorMobile crane lifting a stainless vessel onto a concrete plinthConveyor with transfer chute, walkway, head pulley guard and drive motorMajor shutdown bay with a crane, suspended exchanger, scaffold, live plant and laydown trailerBLEED OPEN

Running

Pump is online. Suction and discharge are open. Discharge pressure is 420 kPa.

Live example of an interactive equipment animation built from a client's drawings, photos and procedures. Select a part, or step through the job. It runs on any phone, tablet or PC. No special software is required.

Sample layouts · not a client document

What you actually get

Open a tab. These are the shapes I work to: a controlled procedure, a test plan, and an indexed pack.

SG-SOP-014

REV 0

PUMP P-101

SAMPLE

Isolate and lock out centrifugal pump P-101

PPE HELMETEYE PROTECTIONGLOVESHEARING
  1. 1. Confirm the pump is the right asset. Tag matches P-101.
  2. 2. Stop the pump. Watch the impeller coast down.
  3. 3. Open the isolator and apply the lock. Keep the key.
  4. 4. Close suction and discharge. Open the bleed.
  5. 5. Prove the gauge reads 0 kPa before you break a joint.

Hold / Caution

Do not remove the lock. Do not open a flange while the gauge is above 0 kPa.

Sequence

How it runs

  1. Enquiry

    Email me the plant, the project, and what you need.

  2. Purchase order

    Work starts when your purchase order is in.

  3. Delivery

    I run the project, the engineering, or the documents from what you send.

  4. Review

    You review. I revise. Then the work is issued.

Who it is for

Owners, operators, and the shops that build the gear.

Mine and plant owners. Project management and mechanical project engineering for capital work, sustaining work and shutdowns.

Operators and maintainers. Procedures, training and shutdown animations for the people who run the plant.

Manufacturers and fabricators. O&M manuals, commissioning dossiers, handover packs, ITPs and MDRs for the equipment you supply.

Mining · Food and beverage · Pharmaceutical · Water and wastewater · Energy · Manufacturing · Packaging · Defence · Rail · Ports

How I work

Direct
You deal with me. I do the work and I answer the email.
Your site format
Documents are prepared in your template, with your numbering and document control.
Mostly remote
The work is done from Sydney, NSW. Site visits are by arrangement.
Australia-wide
Clients can be anywhere in Australia. The job does not have to be in Sydney.
Small business
No account managers. The overhead stays small.